Sign Inspection

You will need an Electrical License to hook up a lighted sign or an other electrical hook ups to a sign.

If the sign installation is over $24,999.99 you will need to a licensed contractor

Types of Sign Inspection Requests

1. Electrical
2. Site
3. Footing
4. Final

Jump to:

Requirements

What Are The Requirements?

You must have an approved sign permit to apply for an inspection through OpenGov.

How Do I Apply?

1

In the OpenGov permitting system.

2

What is the cost?

ItemFee
1. Failure to Obtain PermitDouble Fee
2. Attached Sign-Non Electric$50.00
3. Freestanding Sign$125.00
4. Subdivision Sign$125.00
5. Temporary Sign$30.00
6. Attached Sign—Electric$125.00
7. Installation—$1,000.00 or less$15.00
8. Installation—$1,001.00—$2,000$20.00
9. Installation per $1,000.00 over $2,000.00$5.00
10. Electrical Fee—25 sq. ft. or less$40.00
11. Electrical Fee per sq. ft. over 25 sq. ft.$0.40
12. Electrical Fee Non-UL listed/labeled $25.00
13. Demolition$50.00
14. Billboard/Off-Premise Sign$200.00
15. Projecting Sign$125.00
16. Illuminated Sign$125.00
17. Re-Inspection Fee$50.00

(Code 1986, § 3-8; Ord. No. 9119, § 1, 2-14-89; Ord. No. 9382, 5-29-90; Ord. No. 10278, §§ 3, 12, 8-15-95; Ord. No. 11175, §§ 16, 17, 9-11-01; Ord. No. 11549, § 4, 5-4-04; Ord. No. 11931, § 2, 1-30-07; Ord. No. 12652, § 2, 10-2-12)

Process Details

Approval Process / Evaluation

Contact Us

Zoning Division
Call
(423) 643-5891 (423) 643-5891