Requirements
What Are The Requirements?
Submit an application along with engineered drawings showing all proposed work, streams including top of bank and the 30 and 60 foot buffer zones measured from the top of bank. Include square footage of all disturbances within the buffer zones and whether the disturbance is temporary or permanent. Provide a completed water quality buffer tool showing disturbance and mitigation details. Provide a narrative detailing the need for disturbance in the buffer zone, hardships and other pertinent info to justify why a variance may be reviewed.
Process Details
Status Updates
You should check on the status via the permitting portal, under your stormwater variance application. You may also contact the Site Development Manager.
Processing Time
Review and comments back can generally be expected within 30 days